11:57 am, Monday, January 21, 2013 -- Connecticut Light & Power needs time to crank up its five-year, $300 million System Resiliency Plan, which includes trimming trees, shoring up utility poles and installing heavier wire with a covering designed to resist damage from falling trees.
The merger created a $17.6 billion giant, one of...
Angela Carella: Watching the skies -- and the power lines
Connecticut Light & Power needs time to crank up its five-year, $300 million System Resiliency Plan, which includes trimming trees, shoring up utility poles and installing heavier wire with a covering designed to resist damage from falling trees.
The merger created a $17.6 billion giant, one of...
Comments
Angela Carella: Watching the skies -- and the power lines
11:57 am, Monday, January 21, 2013 -- Connecticut Light & Power needs time to crank up its five-year, $300 million System Resiliency Plan, which includes trimming trees, shoring up utility poles and installing heavier wire with a covering designed to resist damage from falling trees. The merger created a $17.6 billion giant, one of...
Read Full Story